Large Data Center Project

ProTech Fire was asked to be involved in a large, flammable vault storage upgrade. During the course of the project, multiple concerns need to be addressed:

 

  • A customized factory mutual fire protection design was needed
  • Work could only be performed at night and all systems were required to operational by morning
  • System were pre-primed with foam; therefore draining the systems every night required containment and disposal
  • Personnel had to work around hazardous products

 

The project was completed on time with zero incidents or environmental issues. All final testing was witnessed by multiple agencies, all of which accepted and praised the work performed.

  • Project Title : Large Chemical Storage Vault Fire Protection Upgrade